The central at rium interconn ects all three floo rs, links the building comm unity, creat es a daylit multi -purpos e hub while accommodating the turning radius fo r transporting a 4ft diameter, 24ft long pipe filled with hydrolic fluid between labs.
Expos ed conc rete ceilings contain radiant heating and cooling piping. Suspended ceilings are selectively used
The solar wall at penthouse level is angled fo r maximum efficiency and is capabl e of preheating incoming air to 16°C in on clear winter days
Fronting Longwood Road in Hamilton, Canmet Material Technology Laboratory reclaims brownfield lands and is the anchor tenant at McMaster Innovation Park.